Qualification Standard for General Contracting of Electric Power Engineering Construction Level 3 Qualification Standard
__________________________________________________
The net assets of the enterprise are more than 8 million yuan.
Main personnel of the enterprise (1) There should be no less than 8 registered construction engineers specialized in water conservancy and hydropower engineering.
(2) The technical person in charge has more than 5 years of experience in engineering construction technology management, and has an intermediate professional title or above in water conservancy and hydropower engineering related majors or a registered construction engineer qualification in water conservancy and hydropower engineering majors; there should be no less than 10 people with intermediate or above professional titles in water conservancy and hydropower engineering related majors.
(3) There should be no less than 15 construction site management personnel holding job certificates, and there should be complete construction personnel, quality personnel, safety personnel, materials personnel, document personnel, etc.
(4) There shall be no less than 20 skilled workers at intermediate level or above who have passed the assessment or training.
(5) The technical person in charge (or registered construction engineer) has presided over no less than 2 projects that have completed the requirements of Level 2 or above for this category of qualifications. Scope of contracted project
First-level qualifications can undertake the construction of various types of water conservancy and hydropower projects.
Second-level qualifications can undertake the construction of water conservancy and hydropower projects below medium-sized projects and hydraulic structures below building level 3, but the scale of the following projects is limited to the following range: dam height is less than 70 meters, total installed capacity of hydropower stations is less than 150MW, hydraulic tunnel diameter is less than 8 meters (or other types with equal cross-sectional area) and length is less than 1,000 meters, and embankment level is less than level 2.
Level 3 qualifications can undertake the construction of the following water conservancy and hydropower projects with a single contract value of less than 60 million yuan: general contracting of water conservancy and hydropower projects below small (1) type and hydraulic buildings below building level 4, but the following projects are limited to the following scope : The dam height is less than 40 meters, the total installed capacity of the hydropower station is less than 20MW, the total installed capacity of the pumping station is less than 800KW, the diameter of the hydraulic tunnel is less than 6 meters (or other types with equal cross-sectional area) and the length is less than 500 meters, and the embankment level is less than level 3.
Note:
1. Water conservancy and hydropower projects refer to various types of projects (including supporting and ancillary projects) for the purpose of flood control, irrigation, power generation, water supply, waterlogging control, water environment management, etc. The main project contents include: construction of hydraulic buildings (dams, embankments, sluices, spillways, hydraulic tunnels, culverts and culverts, water intake buildings, river regulation buildings, channel buildings, navigation, wood crossings, fish crossing buildings, foundation treatment), hydropower station construction, and water pump station construction. Equipment, hydraulic machinery installation, hydraulic metal structure manufacturing and installation, electrical equipment installation, automated information systems, environmental protection engineering construction, soil and water conservation engineering construction, land consolidation engineering construction, as well as the construction of roads, bridges, communications, hydrology, well sinking and other engineering projects related to flood control and drought relief, and the construction of management housing ancillary engineering related to the above projects, etc. For details, please refer to the "Technical Terminology Standard for Water Conservancy and Hydropower Engineering" (SL26-2012).
2. The grade of water conservancy and hydropower projects is determined in accordance with the "Grading Classification and Flood Standards for Water Conservancy and Hydropower Projects" (SL252-2000).
3. Professional titles related to water conservancy and hydropower engineering include water conservancy and hydropower engineering construction, water conservancy engineering construction, farmland water conservancy engineering, hydropower station power equipment, power systems and automation, hydraulics and river dynamics, hydrology and water resources, engineering geology and hydrogeology, water conservancy machinery and other water conservancy and hydropower related professional titles.

Qualification Standards for General Contracting of Electric Power Engineering Construction Secondary Qualification Standards
__________________________________________________
The net assets of the enterprise are more than 40 million yuan.
Main personnel of the enterprise (1) There should be no less than 15 registered construction engineers specializing in water conservancy and hydropower engineering, including no less than 6 first-level registered construction engineers. (2) The technical person in charge has more than 8 years of experience in engineering construction technology management, and has a senior professional title in water conservancy and hydropower engineering related majors or a first-level registered construction engineer qualification in water conservancy and hydropower engineering majors; there are no less than 30 people with intermediate or above professional titles in water conservancy and hydropower engineering related majors.
(3) There should be no less than 30 construction site management personnel holding job certificates, and there should be complete construction personnel, quality personnel, safety personnel, materials personnel, and document personnel.
(4) There shall be no less than 40 skilled workers at intermediate level or above who have passed the assessment or training.
The company's engineering performance has been undertaken in the past 10 years as general contracting or main project contracting for 3 of the following 7 categories of projects, including at least 1 category of 1 to 2, at least 1 category of 3 to 5, and the quality of the project is qualified.
(1) 2 reservoirs and hydropower station dams with a storage capacity of more than 5 million cubic meters and a dam height of 15 meters or more or a storage capacity of 100,000 cubic meters or more and a dam height of 30 meters or more; (2) 4 sluices with a flow rate of 60 cubic meters/second (excluding rubber dams, etc.); (3) 2 hydropower stations with a total installed capacity of more than 10MW; (4) a total installed capacity of 500KW (or flow rate ≥ 8 cubic meters/second) Seconds) and above 2 pumping stations; (5) 3 hydraulic tunnels with a diameter of ≥4 meters (or other types with equal cross-sectional area) and a length of ≥200 meters; (6) Annual completion of more than 200,000 cubic meters of hydraulic concrete pouring or more than 600,000 cubic meters of dam body earth and stone filling or more than 60,000 meters of grouting or more than 40,000 square meters of anti-seepage walls; (7) Water conservancy and hydropower projects with a single contract value of more than 50 million yuan.
Electric Power Engineering Construction General Contracting Qualification Standards First-Class Qualification Standards
__________________________________________________
The net assets of the enterprise are more than 100 million yuan.
Main personnel of the enterprise (1) No less than 15 first-class registered construction engineers specializing in water conservancy and hydropower engineering.
(2) The technical person in charge has more than 10 years of experience in engineering construction technology management, and has a senior professional title in water conservancy and hydropower engineering related majors; there should be no less than 60 people with intermediate or above professional titles in water conservancy and hydropower engineering related majors.
(3) There should be no less than 50 construction site management personnel holding job certificates, and there should be complete construction personnel, quality personnel, safety personnel, materials personnel, document personnel, etc.
(4) There shall be no less than 70 skilled workers at intermediate level or above who have passed the assessment or training.
In the past 10 years, the company's engineering performance has undertaken general construction contracting or main project contracting for 3 of the following 7 categories of projects, including at least 1 category 1 to 2, at least 1 category 3 to 5, and the project quality is qualified.
(1) Two reservoirs and hydropower station dams with a storage capacity of more than 50 million cubic meters and a dam height of more than 15 meters; or two reservoirs and hydropower station dams with a storage capacity of more than 10 million cubic meters and a dam height of more than 50 meters;
(2) 4 sluices with a flow rate of ≥500 cubic meters/second (excluding rubber dams, etc.); (3) 2 hydropower stations with a total installed capacity of more than 100MW; (4) 2 pumping stations with a total installed capacity of 5MW or more (or flow rate ≥25 cubic meters/second); (5) Hole diameter ≥6 meters (or other hydropower stations with an equal cross-sectional area) (other types) and 4 hydraulic tunnels with a length of ≥500 meters; (6) More than 500,000 cubic meters of hydraulic concrete pouring or more than 1.2 million cubic meters of dam body earth and stone filling or more than 120,000 meters of grouting or more than 80,000 square meters of anti-seepage walls have been completed annually; (7) Water conservancy and hydropower projects with a single contract value of more than 100 million yuan.